Short Lead Time for Cooling Tower Fill - Closed Loop Cooling Tower – Cross Flow – SPL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We are going to dedicate ourselves to providing our esteemed buyers together with the most enthusiastically thoughtful products and services for Baltimore Cooling Tower , Tower Ac Cooler , Condenser And Evaporator Coil , Let's cooperate hand in hand to jointly make a beautiful upcoming. We sincerely welcome you to pay a visit to our company or speak to us for cooperation!
Short Lead Time for Cooling Tower Fill - Closed Loop Cooling Tower – Cross Flow – SPL Detail:

■ Continuous Coil with no seam welding

■ SS 304 coils with Pickling & Passivation

■ Direct Drive Fan saving Energy

■ Electronic De-scalar to reduce Blow down cycle

■ Patented Clog free nozzle

1

Material of Construction: Panels and Coil available in Galvanized, SS 304, SS 316, SS 316L.
Removable Panels (optional): To easily access the Coil and Internal components for cleaning.
Circulating Pump: Siemens /WEG Motor, Steady running, low noise, Large Capacity but low power.
Detachable Drift Eliminator: Non corrosive PVC, Exclusive design

Principle of Operation: The BTC-S series uses the combined flow technology, which improves the efficiency of cooling of process water, glycol-water solution, oil, chemicals, pharma liquids, machine cooling acids and any other process fluids.

The process fluid is circulated inside the coil from where heat is dissipated.

Spray Water and fresh air flow parallel over the condensing coil, which helps to reduce the scale forming “hot spots” that may be found in other conventional Cooling towers. The Process fluid loses its Sensible / Latent Heat as it travels from bottom to top inside the coil sprayed with water and induced air. Reduction in Evaporative cooling component helps to minimize the formation of scale on the coil surface. A portion of this evaporated heat is discharged sideways to atmosphere by the induced air.

The non-evaporated water falls down through the fill section, where it is cooled by a second fresh air stream using evaporative heat transfer media (Fills) and eventually to the sump at the bottom of the tower, where it is recirculated by the pump up through the water distribution system and back down over the coils.

Chemical Tyre
Steel Plant Polyfilm
Automobile Pharmaceutical
Mining Power Plant

Product detail pictures:

Short Lead Time for Cooling Tower Fill - Closed Loop Cooling Tower – Cross Flow – SPL detail pictures

Short Lead Time for Cooling Tower Fill - Closed Loop Cooling Tower – Cross Flow – SPL detail pictures


Related Product Guide:

We are also specializing in improving the things management and QC method in order that we could retain terrific edge inside the fiercely-competitive small business for Short Lead Time for Cooling Tower Fill - Closed Loop Cooling Tower – Cross Flow – SPL, The product will supply to all over the world, such as: Monaco, Panama, Indonesia, Our products are widely recognized and trusted by users and can meet continuously changing of economic and social needs. We welcome new and old customers from all walks of life to contact us for future business relationships and mutual success!
  • We have been looking for a professional and responsible supplier, and now we find it.
    5 Stars By Anna from Vietnam - 2017.09.30 16:36
    The customer service staff is very patient and has a positive and progressive attitude to our interest, so that we can have a comprehensive understanding of the product and finally we reached an agreement, thanks!
    5 Stars By Albert from Japan - 2017.03.08 14:45

    Related Products