Short Lead Time for Cooling Tower Fill - Hybrid Cooler – SPL

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

To consistently enhance the management method by virtue of the rule of "sincerely, fantastic religion and top quality are the base of business development", we extensively absorb the essence of associated goods internationally, and constantly acquire new merchandise to satisfy the needs of shoppers for Cold Room Condensing Unit , Window Coolers , True Beer Cooler , We imagine we'll become a leader in building and producing high quality products in equally Chinese and international markets. We hope to cooperate with a lot more friends for mutual added benefits.
Short Lead Time for Cooling Tower Fill - Hybrid Cooler – SPL Detail:

■ Saves 70% water, 25% less maintenance, 70% chemical saving.

■ Highly corrosion-resistant material and contemporary technology that requires only periodic inspection.

■ Combined parallel air and water paths reduces scale build up and ensure High system energy efficiency.

■ Easy access reduces maintenance and operating costs.

1

Material of Construction: Panels and Coil available in Galvanized, SS 304, SS 316, SS 316L.
Removable Panels (optional): To easily access the Coil and Internal components for cleaning.
Circulating Pump: Siemens /WEG Motor, Steady running, low noise, Large Capacity but low power.

Principle of Operation: The Hot process fluid enters the Dry coil in the top section and dissipates its sensible heat to the Ambient air. This pre-cooled fluid then enters the wet coil in the section below. The Induced Air and Spray water extracts the Sensible and Latent heat from the process fluid and dissipates to the atmosphere.

The cooled liquid then goes back to the process.

The Spray water gets collected in the integrated basin below, and then is recirculated with the help of pump back over the wet coil section, and the Hot Air is blown out vide Axial fans to the atmosphere.

Power Chemical Industry
Mining Pharmaceutical
Data Centre Manufacturing

Product detail pictures:

Short Lead Time for Cooling Tower Fill - Hybrid Cooler – SPL detail pictures


Related Product Guide:

We depend on sturdy technical force and continually create sophisticated technologies to meet the demand of Short Lead Time for Cooling Tower Fill - Hybrid Cooler – SPL, The product will supply to all over the world, such as: Denmark, Surabaya, Nepal, All these products are manufactured in our factory located in China. So we can guarantee our quality seriously and availably. Within these four years we sell not only our products but also our service to clients throughout the world.
  • We have been engaged in this industry for many years, we appreciate the work attitude and production capacity of the company, this is a reputable and professional manufacturer.
    5 Stars By Louis from Yemen - 2018.11.06 10:04
    This enterprise in the industry is strong and competitive, advancing with the times and develop sustainable, we are very pleased to have a opportunity to cooperate!
    5 Stars By Honorio from Macedonia - 2017.11.11 11:41

    Related Products