Short Lead Time for Evaporative Cooling Unit - Closed Loop Cooling Tower – Cross Flow – SPL
Short Lead Time for Evaporative Cooling Unit - Closed Loop Cooling Tower – Cross Flow – SPL Detail:
■ Continuous Coil with no seam welding
■ SS 304 coils with Pickling & Passivation
■ Direct Drive Fan saving Energy
■ Electronic De-scalar to reduce Blow down cycle
■ Patented Clog free nozzle
•Material of Construction: Panels and Coil available in Galvanized, SS 304, SS 316, SS 316L.
•Removable Panels (optional): To easily access the Coil and Internal components for cleaning.
•Circulating Pump: Siemens /WEG Motor, Steady running, low noise, Large Capacity but low power.
•Detachable Drift Eliminator: Non corrosive PVC, Exclusive design
Principle of Operation: The BTC-S series uses the combined flow technology, which improves the efficiency of cooling of process water, glycol-water solution, oil, chemicals, pharma liquids, machine cooling acids and any other process fluids.
The process fluid is circulated inside the coil from where heat is dissipated.
Spray Water and fresh air flow parallel over the condensing coil, which helps to reduce the scale forming “hot spots” that may be found in other conventional Cooling towers. The Process fluid loses its Sensible / Latent Heat as it travels from bottom to top inside the coil sprayed with water and induced air. Reduction in Evaporative cooling component helps to minimize the formation of scale on the coil surface. A portion of this evaporated heat is discharged sideways to atmosphere by the induced air.
The non-evaporated water falls down through the fill section, where it is cooled by a second fresh air stream using evaporative heat transfer media (Fills) and eventually to the sump at the bottom of the tower, where it is recirculated by the pump up through the water distribution system and back down over the coils.
•Chemical | •Tyre |
•Steel Plant | •Polyfilm |
•Automobile | •Pharmaceutical |
•Mining | •Power Plant |
Product detail pictures:
Related Product Guide:
Good quality comes 1st; assistance is foremost; business enterprise is cooperation" is our business enterprise philosophy which is regularly observed and pursued by our company for Short Lead Time for Evaporative Cooling Unit - Closed Loop Cooling Tower – Cross Flow – SPL, The product will supply to all over the world, such as: Sao Paulo, Gambia, Honduras, As an experienced factory we also accept customized order and make it same as your picture or sample specifying specification and customer design packing. The main goal of the company is to live a satisfactory memory to all the customers, and establish a long term win-win business relationship. For more information, please contact us. And It is our great pleasure if you like to have a personally meeting in our office.
By Elma from Borussia Dortmund - 2017.03.28 12:22
Problems can be quickly and effectively resolved, it is worth to be trust and working together.
By Mignon from Sacramento - 2018.02.08 16:45